We fit this thermometer inside every greenhouse we install. Hang it at plant height, away from direct sunlight, and you will get the most accurate reading of actual growing conditions.
The Elite ETI Digital Thermometer tracks three temperatures at once: the current reading, the highest recorded, and the lowest recorded. That means you can check overnight lows each morning without being there. One press of the side button resets the max and min values. Another toggles between Celsius and Fahrenheit.
With a measurement range of -20 to 59.9°C and 0.1°C resolution, it picks up the small temperature shifts that matter for seed germination, overwintering, and frost protection. The ±1°C accuracy is more than enough for greenhouse growing. It runs on a single AAA battery (included) with a rated life of around 4,000 hours.
The compact ABS case has a built-in slot for wall mounting. Position it at bench height on your staging or rear wall for the best results. ETI Ltd manufacture this thermometer in the UK and back it with a one-year guarantee. For humidity monitoring, pair it with the Vitavia Hygrometer (£28).
Delivery Times:
All Models in Plain Aluminium Finish: 4–5 Weeks
Powder Coated Compact, Streamline, Craftsman, High Eave and Belmont: 8–10 Weeks.
All other Powder Coated Models: 10–14 Weeks.
Your new Elite Greenhouse will be delivered directly from the Elite factory using specialised delivery lorries. Delivery is curbside.
We will contact you by telephone at least 7 days prior to delivery. If you have any questions or concerns, please reach out to us.
Optional Installation: If selected, Installation will be carried out 1-8 weeks after the delivery of your Greenhouse. The Installation Team will contact you directly to book in your installation.Our installation service requires a level Concrete, Slabbed or Decked Area to the minimum size stated on the website and with 18-24 Inches of clearance around it. Failure to provide a suitable base area and clearance may result in you being charged for the failed installation If you require staging or shelving assembly, you can arrange it directly with the installation team.