Greenhouse Stores Vitavia Ida quick start
Quick start guide

Vitavia Ida 900, 1300

The Ida lean-to stands on its own base, with its back screwed to a house wall. Build with two people, basic hand tools and a drill, on a square, level base. The build has a base step and six assembly steps, with one sliding door and one roof vent.

Vitavia Ida greenhouse
7steps, base first
2people needed
Square, level base
  • 900 653 × 1300 mm
  • 1300 653 × 1922 mm
How it goes together

The steps

Step 0 drawing 0

Prepare the base

Prepare a square, level base; gather screwdrivers, 10 mm spanners, tape measure, spirit level and drill.

Step 1 drawing 1

Build the front wall

Build the front wall flat on the ground, with the bolts loose.

Step 2 drawing 2

Build ends and roof

Connect the ends and roof, and keep the bolts loose.

Step 3 drawing 3

Fix to the house wall

Square the frame on its base, tighten it, then fix it to the wall with supplied screws and plugs.

Step 4 drawing 4

Build and hang the door

Build the sliding door and fit it into its tracks.

Step 5 drawing 5

Build and fit the vent

Build the roof vent and fit it into the ridge bar.

Step 6 drawing 6

Fit the panes

Fit the glazing seal, then the panes.

Our full step-by-step guide for every size is on this website; Greenhouse Stores also provides professional installation.